Educational Project                  
          
       
     

Equipment & Costs

     

The project aims to support vocational schools (Polytechnic Secondary School) in the Jazira region, which includes ten schools and institutes with approximately 600 students, distributed across cities from Derik to Hasakah.

The main objective is to equip these schools with essential resources, including student supplies, comprehensive school equipment, practical laboratories, and daily consumables, to ensure sustainable and effective educational processes.

This report outlines a detailed plan to achieve these objectives, including the materials needed for each school, their associated costs, and the necessary infrastructure. These materials cover all the basic needs to create a well-equipped learning environment and ensure the successful implementation of the project.

   

Technology & Computing

Laptops

Empowering students with essential tools for digital literacy and programming.

600 items | $360,000–$480,000

E-books

Providing digital access to a vast library of educational resources.

600 items | $60,000–$80,000

Starlink Internet Kits

Ensuring reliable, high-speed internet access for all schools, bridging the digital divide.

30 kits | $30,000–$45,000

Huawei WiFi Mesh Routers

Establishing a strong, stable, and secure internal network within each school.

30 items | $15,000–$20,000

Specialized Laboratories

The project aims to establish 30 fully equipped laboratories of each type, with three specialized labs per type in each of the ten schools. The stated costs cover all needs for the total coverage of these laboratories, including equipment, furniture, and consumables.

Lab A+: Hardware Maintenance (x30 Labs)

Hands-on training in computer hardware assembly and troubleshooting. Ensuring functional and ergonomic learning spaces.

Setup Includes (Per Lab):
  • *Workstations & Furniture: 6 Anti-static workbenches, 6 ergonomic chairs.
  • *Equipment: 6 Used laptops/desktops for testing, 3 complete working computers for software.
  • *Tools: 6 Professional Toolkits (screwdrivers, anti-static straps, cable testers, cleaning supplies).
  • *Consumables: Thermal paste, cable ties, spare screws, hard drive enclosures.
  • *Training Aids: Large screen for tutorials, full set of computer components (CPU, RAM, Motherboards) for disassembly/assembly practice.
  • Cost per Lab: $4,000–$5,000
    Total Cost (30 Labs):
    $120,000–$150,000

Networking Lab (x30 Labs)

Practical experience in building, securing, and configuring local networks (LAN/WAN) and basic servers.

Setup Includes (Per Lab):
  • *Workstations & Furniture: 6 Study desks with integrated power outlets, 6 ergonomic chairs.
  • *Core Devices: 3 Standard Routers, 2 Cisco/Mikrotik Managed Switches for advanced configuration.
  • *Tools: 6 Professional Crimping Toolkits (RJ45, RJ11), Wire Strippers, continuity testers.
  • *Cabling & Patching: 600m of CAT6 cable, Patch panels, wall plates, various patch cords.
  • *Server/Management: 2 Laptops dedicated for server management and simulation software (e.g., Cisco Packet Tracer).
  • Cost per Lab: $5,000–$6,500
    Total Cost (30 Labs):
    $150,000–$200,000

Electronics Lab (x30 Labs)

Introduction to circuit design, advanced measurement, microcontroller programming, and basic robotics.

Setup Includes (Per Lab):
  • *Measurement Tools: 6 Digital Oscilloscopes (DSOs), 6 Function Generators, 12 High-Quality Multimeters.
  • *Workbenches: 6 Anti-static workbenches with adjustable lighting, 6 lab stools.
  • *Prototyping: 12 Arduino & 6 Raspberry Pi Kits, Power supplies (Adjustable DC), 20 Breadboards.
  • *Soldering: 6 Adjustable Soldering Stations with fume extractors, safety gear (goggles, gloves).
  • *Components: Starter kits for Resistors, Capacitors, Diodes, Transistors, and various Integrated Circuits (ICs).
  • Cost per Lab: $7,000–$9,000
    Total Cost (30 Labs):
    $210,000–$280,000

CNC and 3D Printing Lab (x30 Labs)

Learning modern manufacturing, rapid prototyping, 3D design (CAD), and machine operation

Setup Includes (Per Lab):
  • *3D Printers: 10 3D Printers total: 5 pre-built units (for immediate use) and 5 full assembly kits (for hands-on build experience).
  • *CNC Machines: 5 Desktop CNC Machines.
  • *Materials & Supplies: Various filaments (PLA, ABS), CNC bits/tools, lubricating oils, and cleaning supplies.
  • *Infrastructure: Proper ventilation setup (fume extraction hoods), dedicated power lines.
  • *Furniture: Heavy-duty work tables, secure storage cabinets for materials, 6 safety stools.
  • *Software: CAD/CAM software licenses for instructional use.
  • Cost per Lab: $12,000–$15,000
    Total Cost (30 Labs):
    $360,000–$450,000

General Educational Needs

Solar Power Backup Systems

Providing a sustainable and uninterrupted power supply for all school activities.

20 items | $80,000–$90,000

Generators

Reliable power backup to keep all essential systems running during outages.

20 items | $200,000–$360,000

UPS Systems (Uninterruptible Power Supply)

Essential power protection for all computing equipment and sensitive lab devices.

150 units | $35,000–$50,000

Projectors

Enhancing classroom learning and presentations with visual aids.

30 items | $10,000–$12,000

Lesson Filming Equipment

Creating professional educational videos to expand learning resources.

30 items | $45,000–$60,000

Printers (High-quality)

Facilitating the printing of high-quality educational materials and documents.

30 items | $25,000–$50,000

Kitchen Equipment

Ensuring students have access to proper nutrition during their school day.

20 sets | $70,000–$100,000

Library Setup

Establishing modern libraries to foster a culture of reading and research.

20 sets | $50,000–$70,000

Discussion Halls

Creating spaces for dialogue, collaboration, and community building.

20 rooms | $60,000–$80,000

Garden & Sports Areas

Promoting physical activity and a connection with nature for a holistic education.

20 areas | $30,000–$50,000

Vehicles (Hyundai H-1)

Providing essential transportation for project staff and logistics across the region.

8 vehicles | $120,000

Furniture & Infrastructure

Equipping classrooms, labs, and offices with modern, durable furniture.

200 rooms | $600,000–$700,000

Student Meals

Providing daily, nutritious meals to students throughout the academic year.

Annual cost | $300,000–$400,000

Translation & Printing Of Books

Translation and printing of a list of philosophical books into Arabic and Kurdish for students.

Full list | $325,000–$350,000

Total Project Cost Summary

Category / Item Qty / Scope Estimated Cost Range
1. Technology & Connectivity
Laptops & E-books600 Items$420,000–$560,000
Starlink & WiFi Routers30 Kits / 30 Items$45,000–$65,000
2. Specialized Laboratories (30 Labs Each)
Lab A+ (Hardware Maint.)30 Labs$120,000–$150,000
Networking Labs30 Labs$150,000–$200,000
Electronics Labs30 Labs$210,000–$280,000
CNC & 3D Printing Labs30 Labs$360,000–$450,000
3. General & Infrastructure Needs
Power (Solar/Generators/UPS)Various$315,000–$500,000
Furniture & School Infrastructure200 Rooms$600,000–$700,000
Vehicles & Logistics8 Vehicles$120,000
Media (Projectors, Filming, Printers)Various$80,000–$122,000
Support (Meals & Translation)Annual/Full List$625,000–$750,000
.........